If your kitchen isn’t meeting your daily needs, it may be time for a renovation. Here are clear signs to look for:
• Cabinets are worn, damaged, or no longer function properly.
• Layout feels cramped or blocks natural traffic flow.
• Outdated appliances don’t meet your current cooking needs.
• Counter space is limited or poorly positioned.
• Lighting is inadequate for prep, cooking, or entertaining.
• Storage is insufficient or poorly organized.
• Style no longer matches your home or personal taste.
Kitchen renovations can range from cosmetic upgrades to complete layout transformations. Below are the most requested remodel projects and layout changes we deliver for modern, functional kitchens:
New cabinetry improves organization, maximizes space, and updates the overall kitchen style.
Clients often choose quartz, granite, or butcher block for durability and appearance.
Kitchen islands add prep space, seating, and storage, and often become the room’s focal point.
Removing walls creates better flow between the kitchen and living or dining areas.
Reconfiguring tight kitchens into L-shaped or U-shaped layouts improves movement and workspace.
Under-cabinet lighting, pendant fixtures, and added outlets improve function and ambiance.
Repositioning or replacing outdated appliances helps improve workflow and energy efficiency.
A full kitchen renovation involves more than just new cabinets or paint. Here’s what’s typically included in a comprehensive remodel:
• Demolition and Removal – Clear out old cabinets, countertops, appliances, and flooring.
• Layout Reconfiguration – Adjust walls, plumbing, or electrical to improve functionality.
• Cabinet Installation – Install new upper and lower cabinets with custom storage options.
• Countertops and Backsplash – Fit durable, stylish surfaces and backsplash tile for a finished look.
• Lighting and Electrical – Add or upgrade fixtures, outlets, and task lighting zones.
• Flooring Replacement – Install new tile, hardwood, or luxury vinyl for durability and style.
STILL GOT QUESTIONS?
All appliances, dishes, food items, and personal belongings should be removed. Temporary kitchen access should also be planned if the space will be fully demoed.
Yes. Any work involving plumbing, electrical, structural changes, or appliance relocation will require permits to ensure the project meets local building codes.
Yes, but relocating lines requires coordination with licensed trades and may impact walls, flooring, and budget. These changes are usually made early in the project timeline.
Most standard kitchen renovations take 4 to 8 weeks depending on scope, materials, and whether structural changes are included.
Not always. Semi-custom and stock cabinets are available, but custom cabinets are often used for exact fit, improved layout, and unique storage needs.
Work with a skilled team to upgrade layout, finishes, and function—built to code and customized to your needs.
© 2025 All Rights Reserved | A & K Construction